Solar power plant new project hiring for freshers to 25 yrs
List solar power plant new project hiring for freshers to 25 yrs
-
solar power plant operation & maintenance head solar power electrical quality engineer / sr engineer solar power epc head electrical site engineer solar power project engineer / manager / incharge solar plant installer manager -energy management & control engineering manager - solar epc & electrical projects junior / engineer / sr engineer β electrical dipartment junior engineer / engineer / sr engineer β instrument dipartment junior engineer / engineer β civil dipartment junior engineer / engineer it or computer science - process engineer electricern / instrument tech / fitter β junior / experience junior / senior β accountant junior / senior β hr officer sales & marketing manager manager / officer β store dipartment manager / ast manager β instrument / electrical dipartment manager / sr engineer / engineer β instrument & control dipartment plc / scada operation engineer β instrument engineer freshers engineer β electrical / electronics / civil / c
Rewa (Madhya Pradesh)
-
Team leader computer hardware & networking engineer integration engineer rf network planning and optimization engineer coordinator β operation kew account manager business development β manager operation manager rf engineer ran engineer bts engineer ftth engineer quality analyst service head tech support manager telecom testing β project head system engineer
Lucknow (Uttar Pradesh)
-
Brand new woollen sweater for 2 to 5 yrs kids kids
βΉ 600
-
new long gown for 5 to 7 yrs girl very beautiful valvet with net
βΉ 1000
-
new westrn dress for 6 to 7 yrs girl embroidery plazo 30 to 32 size
βΉ 1300
-
Brand new branded pant for 2 to 3 yrs old girl
βΉ 500
-
new baby frock for 3 to 4 yrs baby super quality
βΉ 999
-
On-grid solar power plant in lucknow is providing best quality solars in best priceqr code link to this post on-grid solar power plant is a solar power generated a system that is directly connected to the utility gridit is a long investment
-
High output solar power plant hi quality solar panels 1kw for rs kw for rs kw for rs above in 3 kw for / kwatts solar inverter likes abb, delta, kirloskar, sma, siemens, polycab
βΉ 50000
-
Qr code link to this post 1kw solar power plant (48v) sl no item make spec nos 1 solar ups 1kva 48 v mro tek 1 kva 1 2 solar panels radiant/emmvee 250 w 4 3 solar c10 battery luminous/okaya 150 ah 4 4 cables and mc4 connector siechem dc tint copper 10 mtr 5 ajb with surge protector renergy mnre 1 6 panel structure renergy gi 1 7 installation charge renergy renergy 1
-
Qr code link to this post 2kw solar power plant (48v) sl no item make spec nos 1 solar ups 2kva 48 v mro tek 2 kva 1 2 solar panels radiant/emmvee 250 w 8 3 solar c10 battery luminous/okaya 150 ah 4 4 cables and mc4 connector siechem dc tint copper 10 mtr 5 ajb with surge protector renergy mnre 1 6 panel structure renergy gi 1 7 installation charge renergy renergy 1
-
Qr code link to this post 650va solar power plant sl no item make spec no's 1 solar ups 650 v mro tek/ renergy 650v 1 2 solar panels radiant/emmvee 250 w 2 3 solar c10 battery luminous/okaya 150 ah 1 4 cables and mc4 connector siechem dc tint copper 10 mtr 6 panel structure renergy gi 1
-
Qr code link to this post 3kw solar power plantsl no item make spec nos 1 solar ups 3kva 48 v mro tek 3 kva 1 2 solar panels radiant/emmvee 250 w 12 3 solar c10 battery luminous/okaya 150 ah 4 4 cables and mc4 connector siechem dc tint copper 10 mtr 5 ajb with surge protector renergy mnre 1 6 panel structure renergy gi 1 7 installation charge renergy renergy 1
-
Qr code link to this post 3kw solar power plant (96v) sl no item make spec nos 1 solar ups 3kva 96 v mro tek 3 kva 1 2 solar panels radiant/emmvee 250 w 12 3 solar c10 battery luminous/okaya 150 ah 8 4 cables and mc4 connector siechem dc tint copper 10 mtr 5 ajb acbd & dcdb with surge protector renergy mnre 1 6 battery panel structure renergy gi 1 7 panel structure renergy gi 1 8 installation charge renergy renergy 1
-
Qr code link to this post 1kw solar power plant (24v) sl no item make spec nos 1 solar ups 1kva 24 v mro tek 1 kva 1 2 solar panels v radiant/emmvee 250 w 4 3 solar c10 battery luminous/okaya 150 ah 2 4 cables and mc4 connector siechem dc tint copper 10 mtr 5 ajb with surge protector renergy mnre 1 6 panel structure renergy gi 1 7 installation charge renergy renergy 1
-
2kva,solar power plant rs / subsidy scheme materials details: solar panel-200wattsΓ6nos=watts,-green tech or vikram solar, invertor-2kva-1no-luminuous, battery-150ah-4nos,-luminuous, mounting stature-ms-1set, (850va to 3kva available) transport,installation charge, civil work customer side, other details ct
βΉ 41000
-
Ongrid solar power plant availlable for school, college,hospital,nursing home,hotels,domestic and commercial purposefor 5kw and above price is βΉ per kw5kw to 3kw price is βΉ per kwplease message your requirment with contact number for a call back for any kind of discussion
βΉ 50000
-
solar power plant call ** with battery back up: /kw kseb link type: /kw solar water heater 100 ltr 150 ltr 200 ltr and 500ltr available solar inverter avoid the powercut and stay away from normal inverters
βΉ 135000
-
solar power plant installation up is trusting agency for all of youin/solar-power-plant-installation-upvisit for more information: http://wwwqr code link to this post it is best ever agency that take installation in a better or different way as per your desire
-
project incharge β epc transission & distribution country head epc β transmission & distribution sr engineer / engineer β transmission & distribution project engineer β electrical & civil head eng β transmission & distribution gis β installation & commissioning engineer electrical commissioning ast manager / sr engineer electrical engineer β lt & ht system electrical design engineer business development β manager / officer energy market analyst electrical o & m engineer / srengineer switch yard engineer electrical testing incharge / manager / engineer electrical automation manager / sr engineer sub station project incharger / manager electrical automation & control manager sr engineer & engineer sub station o & m incharger / ast manager / engineer pannel errectio & commissioning engineer / sr engineer plc & scada operation & maintenance engineer instrument & automation - engineer / sr engineer / ast manager / manager freshers β electrical / electronic
Ajmer (Rajasthan)
-
Off-grid solar power plant with 25years on site warrantee
βΉ 85000
-
solar power plant installation all india service very good panel
βΉ 15000
-
2kw solar power plant (48v) sl noitemmakespecnos 1solar ups 2kva 48 vmro tek2 kva1 2solar panels radiant/emmvee250 w8 3solar c10 batteryluminous/okaya150 ah 4 4cables and mc4 connectorsiechemdc tint copper10 mtr 5ajb with surge protectorrenergymnre1 6panel structurerenergygi1 7installation chargerenergyrenergy1
-
hiring for freshers us it recruiters/ technical recruiters must be proficient to communicate in english language possess basic technical knowledge must be comfortable to work in night shift 5 days working in mohali benefits: salary 15k + incentives free + cab + meal ajob solution sco 87,88 first floor sector 34 a chandigarh contact us 9041835968/0172-4618087 akjobsolutionchd@gmail
India
-
Current requirements; hiring for freshers: bba/bca/b tech in mohali salary: stipend training for 6 months,12-15k after completion of trainingnet/php/:experienced salary:hike on previous package ak job solution, sco no 87-88 ground floor, office no: 3, sector 34 a chandigarh mobile no:- 9041835968,8699749582
Chandigarh (Chandigarh)
-
new 4 piece dress for 4 to 5 yrs girl 24 to 26 size with red jacket
βΉ 1500
-
Brand new kids fancy dress for 2 to 3 yrs old kid at fixed price can be delivered at ur home in rohini
βΉ 399